Power Grid Map

Greece Power Grid Map

Substations, transmission lines and power plants across Greece and its islands on one map, with the companies that own, operate and develop them.

Find the companies behind them, what they are building, and the people to talk to.

Tera power grid map of Boeotia, north of Athens, between Thebes and Chalkida: wind and solar farms with their capacity, several under construction, along the high voltage lines and the 150 kV network
Boeotia, north of Athens: wind and solar farms, many under construction, along the high voltage lines

Coverage

Who you can do business with in Greece

Tera follows 347 companies that own, run, build or develop power plants and projects in Greece, and 791 people who work for them. Behind them, Tera holds 448,099 details on 19,981 plants, substations and charging stations in Greece, covering names, status, technology and fuel, size, start dates, exact locations and addresses, voltages, owners and operators, and 7,340 links between these assets and the companies involved, from owners, operators and developers to builders, maintenance firms, equipment makers, lenders, investors and power buyers: the whole picture, not a list of names. Figures as of 22 November 2026.

What is here for your business

  • Installers and local contractors

    Tera tracks 528 projects under 5 MW in development in Greece, and shows who is behind each one and who decides there.

  • EPC and construction firms

    Tera tracks 1,781 projects of 5 to 50 MW and 444 of 50 MW and above in development in Greece. Find the ones close to building, and the people who choose their contractors.

  • Equipment and service suppliers

    Tera tracks 2,754 projects in development in Greece that will need panels, turbines, batteries, cables and services, and names the developer behind each one and the people who decide what they buy.

  • Investors and buyers of operating plants

    Tera links 320 owners to plants in Greece. Find plants that fit your mandate, who holds them today, and who would decide on a sale.

  • Keep an eye on your competitors

    Whatever your line of business, see which projects the 347 companies Tera follows in Greece are working on, who they work with, and where they are growing.

Projects in development

Projects in development in Greece, by size, and how many are already under construction.

Project sizeProjects in developmentUnder construction
All projects in development2,754223
Under 5 MW528<100
5 to 50 MW1,781145
50 MW and above444<100
Other sizes, or size not recorded<100<100

Companies and people

The companies behind these plants and projects, and the people who work for them. This page counts them; the platform names them, with their projects and contacts.

Companies and peopleNumber
Companies involved347
Owners (shareholders)320
Professionals working at these companies791

What Tera knows about Greece

For every plant, Tera records, where known, its size and technology, its status and start date, its exact location, who owns it and with what share, who runs it, and who built, maintains and finances it. Records cover every plant size and every voltage level, so totals differ from national statistics, which usually count only larger plants or transmission substations.

RecordsNumber
Details recorded448,099
Plants, substations and charging stations19,981
Links between these assets and companies7,340
Substations501
Power plants in operation11,454
Transmission towers34,156

4,223 assets and companies in Greece were updated in the seven days to 21 November 2026. See what changed across Tera this week

  • Transmission and substations

    The 400 kV and 150 kV network and its substations, filterable by voltage level, with the links to the islands and to neighbouring countries.

  • Generation and pipeline

    Solar, wind, gas, lignite, hydro and storage plants, and the large pipeline of projects in development, many of them under construction, each linked to its owners.

  • Data centres and large loads

    Data centres and EV charging stations next to the substations that serve them, so you can see where demand is clustering.

Market context

How the grid works in Greece

Grid operators in Greece
OperatorAreaRole
IPTO (ADMIE)All of Greece's high voltage grid, including the island linksTransmission system operator
HEDNO (DEDDIE)All of Greece, and the power systems of islands not linked to the mainlandDistribution system operator

Greece has one transmission operator, IPTO (also known as ADMIE), which runs the high voltage grid and the balancing market, and one distribution operator, HEDNO, which runs the local networks nationwide. HEDNO also operates the power systems of the islands that are not connected to the mainland, a number that falls as new subsea links connect more of them.

Solar, wind and now battery storage are built mainly as private projects, each needing a connection offer from IPTO or HEDNO. Connection capacity is the main constraint: far more projects hold connection terms than the grid can absorb at once, and curtailment of solar and wind has been rising, which is why storage is now being added through auctions and dedicated connection allocations.

See Greece on the map

Free shows the power plants and the grid. Pro adds every layer, grid headroom included, from €79 a month.Free shows the power plants and the grid. Pro adds every layer, grid headroom included, from $79 a month.